Pelco - C3422M-B

Below are all the different types of Pelco. Select the device of your choice, to download the manual


Click here to download the manual

Contents

INSTALLATION Pendant Back Box with Fiber Optic Option C3422M B 3 08 Preinstallation NOTE This manual is designed to be a reference tool for the installation of your system For best results and ease of Installation the dome system should be assembled pressurized and tested before installation A Pressurized Spectra IV cable harness supplied with the back box Is required to test and monitor the pressurized dome 1 Install the fiber optic module Open the hinged door to the back box by pushing the tab lock towards the wall of the unit and lifting the door open Remove the plug from the IB pin connector Install the module In the 16 pin connector Secure the module to the circuit board standoff using the screw and lock washer provided Figure 1 I ...